INLET TREATMENT WORKS

By pre processing pump station and trap waste at inlet work sites Eco Clarity is able to separate FOG and bio-organic solid waste before it enters the inlet works requiring further chemical and mechanical methods to remove it. If not fully removed and treated, the FOG can deplete oxygen in receiving waters. Additional capacity and energy is required at wastewater treatment works to handle excess FOG entering the system.

The Eco-Ceptor plant is able to drive and dewater solids and rags for collection as Biogas feedstock before dewatering the FOG for Biodiesel production. The separated water effluent now enters the inlet works as part of the usual processing 

Eco Clarity Ltd

Reg: 08420445

Office 123, 210 Upper Richmond Road, London, SW15 6NP, United Kingdom

E: enquiries@eco-clarity.com     ​​Ph: +44 203 289 5188 

Copyright © Eco Clarity Ltd - 2014